Skip to content
The Tunnel poster
Poster for The Tunnel

The light runs out

In 2007, in the midst of the drought and water shortages, the NSW State government has unveiled plans to tap into and recycle millions of litres of water trapped in a network of abandoned train tunnels just beneath the heart of Sydney. However the government suddenly goes cold on the plan and it is not made public why. There is talk of homeless people who use the tunnel as shelter going missing, even though the government states that there are no homeless people in there. This, and the silence from the officials and ministers, leads a journalist, Natasha to begin an investigation into a government cover-up. She and her crew Pete (Producer), Steve (Cameraman) and Tangles (Sound Technichian) decide to investigate the story in the tunnel.

Videos

News

No news articles linked to this title yet.

No scenes added yet

Be the first to help others prepare.

Help others prepare

Sign in to share scary scene timestamps.

Country Date Format Certification
Australia May 19, 2011 Theatrical M
United States May 19, 2011 Theatrical NR
United Kingdom Aug 6, 2012 Theatrical 15
Bottom star pattern decoration

The Tunnel Ratings

Overall

Overall rating of the media

0.0 0 ratings

Scares

How effective are the jump scares

0.0 0 ratings

Atmosphere

How immersive and tense is the atmosphere

0.0 0 ratings

Gore

Level and quality of gore/violence

0.0 0 ratings

Story

Quality of the storyline and plot

0.0 0 ratings

Special Effects

Quality of special/visual effects

0.0 0 ratings

Sound Design

Audio quality and sound effects

0.0 0 ratings

Pacing

Flow and timing of the narrative

0.0 0 ratings